Land was purchased in 2005 in
Ramsey, Minnesota, five miles from the existing
facility |

Surveying and plot preparation
began in May of 2006 |

Foundation work was started in
June of 2006. Life Fitness is shown in the
background. |

Block work on the outer walls
started in July/August of 2006 |

Another view of block work from
the same time frame |

This new facility will give
Riverside room to grow |

Exterior Block work is finished,
now for the roof |

A view of the interior. The roof
is up but not the floor |

The floor is poured and the
offices can be erected |

There is plenty of power capacity
for additional equipment. |

A view of our climate-controlled
Inspection Department |

Our Niigata Horizontal CNC Mill
was the first CNC up and running |

We have room for three more Mazak
Horizontal CNC's. This picture taken before the
installation of the Flexible Manufacturing
System. See more
information about these machines |

A view down one of the main shop
corridors |

Dedication and ribbon-cutting
ceremony was held on April 20, 2007. Shown here
with Riverside management are the Mayor, City
Council, and Community Development
representatives |